home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V09_5 / V9_530.ZIP / V9_530
Internet Message Format  |  1991-07-08  |  18KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from corsica.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr1/ota/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr1/ota/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/MYfif9y00UkVASYU5F>;
  5.           Mon,  3 Jul 89 00:25:46 -0400 (EDT)
  6. Message-ID: <IYfiex-00UkVMSWk4x@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Mon,  3 Jul 89 00:25:34 -0400 (EDT)
  11. Subject: SPACE Digest V9 #530
  12.  
  13. SPACE Digest                                      Volume 9 : Issue 530
  14.  
  15. Today's Topics:
  16.              space news from May 15 AW&ST
  17.              Re: Space station computers
  18.              Re: new space goals
  19.          Newspaper article on Insat accident results
  20.               Re: Let's go back
  21. ----------------------------------------------------------------------
  22.  
  23. Date: 2 Jul 89 05:44:32 GMT
  24. From: jarvis.csri.toronto.edu!utgpu!utzoo!henry@rutgers.edu  (Henry Spencer)
  25. Subject: space news from May 15 AW&ST
  26.  
  27. NASA abandons the notion of a serviceable design for the polar platform,
  28. reverting to a one-shot expendable approach.  [Hard to avoid, given the
  29. lack of any way to service it...]
  30.  
  31. NASA plans to build a ground-based radar system to assess how bad the
  32. small-space-debris problem is, specifically with reference to the space
  33. station.  Existing radars track big pieces but not small ones.
  34.  
  35. SDI budget cuts slip Zenith Star space-laser experiment two years, at least.
  36.  
  37. Bush selects "Endeavour" as name of new orbiter, after Captain Cook's first
  38. command, used in exploration of the Pacific, including Alaskan waters.
  39. [As reported by others, AW&ST left out the "u" in the name.]
  40.  
  41. Authoritative report that the Titan 34D launch on May 10 was a pair of
  42. strategic-forces comsats.  [Said report was later retracted; it was a
  43. snoopsat instead.  The comsat pair is still waiting for launch.]
  44.  
  45. Magellan doing well en route, with daily star calibration maneuvers being
  46. done to assess gyro drift.
  47.  
  48. A day before landing, the Atlantis crew replaced one of the orbiter's
  49. five general-purpose computers after it failed.  The orbiter routinely
  50. carries a spare, and the crew are trained in the replacement procedure,
  51. but it took about four hours because the computers are behind some of
  52. the middeck lockers and are not easy to get at.
  53.  
  54. Atlantis lands successfully at Edwards.  Landing on the lakebed runway
  55. had been planned, but crosswinds were too strong and plans shifted to
  56. one of the concrete runways.  The landing was made there with an 8kt
  57. crosswind, which suited NASA fine, as landing in a mild crosswind has
  58. been a test objective for quite a while.
  59.  
  60. NASA proposes to switch much of the station's power system from solar
  61. arrays to a solar dynamic scheme.  Solar-dynamic was originally put off
  62. to phase 2, but the technology has developed well and an important
  63. advantage has appeared:  by using a phase-change heat-storage system,
  64. a solar dynamic system can maintain full output even when the station
  65. is in Earth's shadow.  Doing the same for solar arrays requires large
  66. battery banks, which deteriorate and have to be replaced, to the tune
  67. of the equivalent of a dedicated shuttle mission every five years just
  68. for battery replacement.  Solar-dynamic systems also make power growth
  69. cheaper, a significant issue since some feel the station is underpowered.
  70. The station would probably retain one modest solar array for emergency
  71. power.  Station management has not yet approved the switch; general
  72. consensus seems to be that it may be a good idea but it's disturbing
  73. that such major changes are still showing up now.
  74.  
  75. US and Soviet scientists propose monitoring firing of high-powered lasers
  76. into space by placing scattered-light detectors 1 km or so from suspected
  77. antisatellite-laser locations.  This could help verify a laser-Asat ban.
  78.  
  79. Soviet shuttle orbiter will appear at the Paris air show, contrary to
  80. earlier reports.  It will be carried there on the new Mriya heavylift
  81. transport aircraft, which will also star at the show.  [This report
  82. quotes Soviet aviation officials as saying that the Paris orbiter will
  83. be a test article, but I think it turned out to be Buran itself.]
  84.  
  85. Space Services Inc. and Space Data Corp. selected as contractors for
  86. commercial sounding-rocket services being bought by NASA for materials
  87. science.  Contracts are for two launches each, with options on two more.
  88.  
  89. NASA science managers [now there's a job title for you... :-)] say that
  90. Soviet radarsat reactors will be a "nuisance" to the Gamma Ray Observatory,
  91. requiring careful planning of operations but not badly disrupting them.
  92. Crucial instruments will be turned off for short periods during close
  93. encounters with the radarsats themselves, and will be adjusted to avoid
  94. reporting gamma rays produced by electrons and positrons that the reactors
  95. emit.  This will complicate mission planning but will reduce scientific
  96. returns only slightly.  More reactors in orbit, however, would be bad news.
  97.  
  98. Martin Marietta gets contract for the space station's Canadian Contribution
  99. Duplication, er excuse me Flight Telerobotic Servicer.  MM's latest design
  100. is much more anthropomorphic than older designs, with a pair of video
  101. cameras with zoom lenses and spotlights in the "head" and a pair of arms
  102. attached to the "shoulders" of a roughly-rectangular equipment box.
  103. There is a third arm, located... um... where a tail would be but in
  104. front :-)... which will anchor the servicer to its work site.  There will
  105. be a flight test in 1991, aimed mostly at human-factors assessment, and
  106. a full flight demonstration in 1993.
  107.  
  108. SDI prepares to launch a neutral-particle-beam experiment on a sounding
  109. rocket.  The main objective is to examine how the beam propagates away
  110. from the spacecraft and interacts with the near-spacecraft environment.
  111. The hope is to demonstrate that problems with NPB technology, formerly
  112. thought to make it impractical as a useful weapon, have been overcome.
  113.  
  114. Letter from Michael Lang, commenting on an earlier expendables-are-best
  115. letter:
  116.  
  117.     "H.L. Anderton is apparently living in a dream world if he thinks
  118.     we would be able to recover from an expendable launch failure in
  119.     a month.  Maybe he forgets that there have been long launch
  120.     delays after every recent failure.  The incidents all have one
  121.     crucial thing in common with the recovery process after the
  122.     Challenger failure -- bureaucrats.  Every time we have a failure,
  123.     it's not the engineers who determine the problems and solutions.
  124.     A bunch of bureaucrats form advisory panels, testify endlessly
  125.     in blue-ribbon, round-table discussions, and make technical
  126.     decisions about systems they may not have seen in years (if ever).
  127.     Meanwhile the technical people, who live and work with these
  128.     systems every day, are forced to worry about layoffs and wait..."
  129. -- 
  130. $10 million equals 18 PM       |     Henry Spencer at U of Toronto Zoology
  131. (Pentagon-Minutes). -Tom Neff  | uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  132.  
  133. ------------------------------
  134.  
  135. Date: Thu, 29 Jun 1989 12:17-EDT 
  136. From: Dale.Amon@H.GP.CS.CMU.EDU
  137. Subject: Re: Space station computers
  138.  
  139. >    At normal viewing distances, 120dpi (which is only twice what
  140. >    my Mac delivers) would be more than acceptable.  32 bit color
  141. >    will probably be standard.  Remember however that the more
  142. >    dpi, the more memory required, the higher the dot clock rate,
  143. >    (faster memory required), and the more bits you have to twiddle
  144. >    to repaint the screen.
  145.  
  146. 120 dpi is not acceptable for archival purposes. 400dpi is probably
  147. marginal. Would you want the Mona Lisa archived for historians at only
  148. 120dpi? I wouldn't even store my personal archives at that low a dpi.
  149. And even if you store high and downsample on display, then you still
  150. have to do hardcopy everytime you want to study color pictorial
  151. material.  I would not want to store and display photographic material
  152. at a resolution less than the grain size of the film. This WILL come. I
  153. have talked with library and archive people. BELIEVE ME, 120 dpi isn't
  154. even close to acceptable. Of course, someone has to bust the Adobe Systems
  155. silliness about limiting the output in Postscript to low (400dpi or so)
  156. resolution even on printing, but they won't be able to withstand the
  157. push that I expect in the next decade.
  158.  
  159. >    Cute, but most people will be keybanging and mousing, because
  160. >     the world runs on shuffling words around.  Unless you are doing
  161. >    3D work, you don't need fancy datagloves.  Voice is fine for
  162.  
  163. I did not mention datagloves, I was speaking of the Sensor Frame (TM).
  164. And which is faster, pointing with a mouse, clicking to select a tool,
  165. moving to the beginning of a phrase, clicking to select the start of
  166. range, moving to the end, selecting the end of the range, moving to the
  167. target location... Or spanning the text with two fingers, saying
  168. "Move", pointing at the insertion point and saying "HERE"?
  169.  
  170. >    I'd be surprised to see 64MB PC's this year, especially for
  171.  
  172. NeXT is only waiting for the quantities to be available. The NeXT
  173. machine as it exists TODAY can handle this. It has simply not been
  174. tested with the new chips.
  175.  
  176. >    Hey, what's a factor of 2000 between friends?  You may have
  177.  
  178. Yeah, you are probably right. Probably won't be more than 128GB by
  179. 1998...
  180.  
  181. ------------------------------
  182.  
  183. Date: 29 Jun 89 17:19:17 GMT
  184. From: bfmny0!tneff@uunet.uu.net  (Tom Neff)
  185. Subject: Re: new space goals
  186.  
  187. In article <1989Jun28.165104.1307@utzoo.uucp> henry@utzoo.uucp (Henry Spencer) writes:
  188. >In article <14409@bfmny0.UUCP> tneff@bfmny0.UUCP (Tom Neff) writes:
  189. >>LET'S BUILD A PAIR OF MARS STATIONS, IN ORBIT AND ON THE SURFACE, BY 2040.
  190. >
  191. >You realize, I hope, that that's FIFTY YEARS away, and Apollo only took ten.
  192. >If I was trying to set an ambitious goal, I'd make it initial deployment
  193. >in 2001 and full operation by 2005.  A determined effort ought to be able
  194. >to get the necessary hardware development done in a decade, even starting
  195. >from the current mess.
  196.  
  197. It took twelve years from Sputnik to Tranquillity.  Twenty years after
  198. *that*, space is once again a certified people-free zone.  Mars is such
  199. a mammoth project (much harder than the Moon) that fifty years seems
  200. reasonable to me.  That's how long people spend building cathedrals
  201. (Robert Schuller excepted).
  202.  
  203. Which is not to say we couldn't have footprints crunched into Chryse
  204. Planitia in a decade or 15 years if we went all out Apollo-style, making
  205. every compromise possible in mission and infrastructure for the sake of
  206. the symbolic sprint -- Apollo-style.  But what you'd have left would be
  207. another bag of rocks and another failed Roanoak, this time eroding
  208. rapidly in the thin Martian dustwind instead of baking in vacuum silence
  209. on the timeless Lunar grit.
  210.  
  211. What we can do in 10 years simply doesn't last.  What we can do in 50
  212. might.  I want to follow the Antarctica model - establish an
  213. international scientific outpost in a distant, hostile environment.
  214.  
  215. By drawing the program out timewise, you provide an ongoing focus of
  216. activity that *defines* a half century of endeavor.  New space powers
  217. like China or Israel can do something useful right away, rather than
  218. concentrating on prestige shots and comsats.  You engage a *generation*
  219. of scientists and spaceflight professionals in significant cooperation,
  220. so that it has a chance of becoming second nature.
  221.  
  222. >Let's see...  The USSR does the heavylift boosters and nuclear-electric
  223. >space propulsion, since they already have most of that done or in the
  224. >works.  Japan does the electronics, of course.  ESA builds the crew
  225. >quarters, based on Spacelab experience.  The US does... um... well...
  226.  
  227. Simple, Henry.  The US builds an elaborate Peace Shield to protect the
  228. Mars outpost from surprise nuclear attack.  :-)
  229.  
  230. Oh yes, and you "North Americans" can build some more RMUs.  It's what
  231. you do, after all -- and you do it so well.  Who'd have guessed that
  232. Canada's role in space would turn out to be exporting arms?
  233.  
  234. >NASA is to spaceflight as the  |     Henry Spencer at U of Toronto Zoology
  235. >US government is to freedom.   | uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  236.  
  237. Let's see... Glavkosmos is to spaceflight as the USSR is to vodka?  :-)
  238.  
  239. -- 
  240. "My God, Thiokol, when do you     \\    Tom Neff
  241. want me to launch -- next April?"  \\    uunet!bfmny0!tneff
  242.  
  243. ------------------------------
  244.  
  245. Date:     Thu, 29 Jun 89 15:02:19 CDT
  246. From: Will Martin <wmartin@ST-LOUIS-EMH2.ARMY.MIL>
  247. Subject:  Newspaper article on Insat accident results
  248.  
  249. This was in the St. Louis Post-Dispatch, Wednesday, June 24 1989, page 3C:
  250.  
  251. SATELLITE LAUNCH WEEKS AWAY
  252.  
  253. Washington -- A "very unfortunate" launch pad accident last week in
  254. Florida will delay what was to have been the first major private-sector
  255. US launch of a satellite by at least several weeks and possibly many
  256. months, officials say.
  257.  
  258. McDonnell Douglas Corp. was scheduled to loft a communications satellite
  259. for the government of India aboard its Delta 2 rocket on Thursday,
  260. making it the first American company to dispatch a paying customer's
  261. cargo to orbit.
  262.  
  263. The company is one of three major American rocket makers trying to
  264. compete for commercial satellite business with the European consortium
  265. Arianespace, which has cornered more than half the free world market.
  266.  
  267. The competition is an outgrowth of the Reagan administration's efforts
  268. to encourage development of a private-sector launch industry. Previous
  269. US launches have been conducted by NASA or the Air Force.
  270.  
  271. The accident happened June 19, when a hoist cable snapped, allowing a
  272. heavy steel hook to fall on the $70 million Insat 1D satellite and
  273. damage a critical antenna.
  274.  
  275. The cable was part of a 5-ton bridge crane that had been used to lift
  276. the satellite 116 feet to the top of a Delta 2 rocket, built by McDonnell
  277. Douglas Space Systems Co. of Huntington Beach, CA, at a launch pad
  278. leased from the Air Force at Cape Canaveral.
  279.  
  280. The satellite has been removed from the rocket and sent to the company's
  281. Florida facility, where potentially lethal propellants must be unloaded
  282. before the satellite's manufacturer, Ford Aerospace Communications Co.
  283. of Palo Alto, CA, and a representative of the customer, India's
  284. Department of Space, will be able to assess the damage, according to
  285. McDonnell Douglas spokesman [sic] Sheila Carter.
  286.  
  287. The company plans to proceed with other launches scheduled on its Delta
  288. rockets, she said, including a Navstar navigation satellite in late July
  289. and a British media satellite in mid-August.
  290.  
  291. "There's a good chance the satellite will have to be sent back" to the
  292. plant in California, said Susan Pearce of Ford Aerospace. There is no
  293. spare antenna, and a new one may have to be built.
  294.  
  295. Some sources said that finding a new launch slot might take longer than
  296. repairing the satellite -- up to a year if the launch schedule isn't
  297. juggled to make a new opening.
  298.  
  299. In addition to the Delta boosters, Martin Marietta Astronautics Group of
  300. Denver is marketing a commercial version of the big Titan 34D rocket,
  301. and General Dynamics Corp. of St. Louis is selling Atlas-Centaur rockets.
  302. ***End of Article***
  303.  
  304. Hope this is of interest and doesn't duplicate something already posted!
  305. (I see the Space stuff on the Digest and it runs about a week or so
  306. later than the USENET.)
  307.  
  308. Regards, Will Martin
  309.  
  310. ------------------------------
  311.  
  312. Date: 28 Jun 89 23:22:47 GMT
  313. From: amdcad!weitek!sci!daver@ucbvax.Berkeley.EDU  (Dave Rickel)
  314. Subject: Re: Let's go back
  315.  
  316. In article <1989Jun22.161538.3937@cs.rochester.edu>, dietz@cs.rochester.edu (Paul Dietz) points out that i goofed.
  317.  
  318. Damn.  Don't hire me as an astrogator.  I should have realized that the numbers
  319. looked funny.
  320.  
  321. Anyway, new numbers.  Some of them are more accurate than the last bout.  I've
  322. probably made some more stupid mistakes, but what the hell.
  323.  
  324.  
  325. LEO (500 im) to lunar transfer orbit (LTO) (figure earth escape orbit):
  326.     3.153 km/sec
  327.  
  328. LTO to LLO (200 km)
  329.     0.698 km/sec (this number is probably high, but i didn't want to
  330.             work out three-body problems)
  331.  
  332. LLO to Lunar surface
  333.     1.766 km/sec
  334.  
  335. LTO to Lunar surface (this number is also probably high, for the same reasons)
  336.     2.411 km/sec
  337.  
  338. 1 minute hover at lunar surface
  339.     0.097 km/sec
  340.  
  341. 3 minutes hover
  342.     0.292 km/sec
  343.  
  344.  
  345. OK.  From LEO to lunar surface is 3.153 + 2.411 + .292 is 5.9 km/sec.  Call it
  346. 6.  That's still high enough that you'd probably want to use Hydrogen/Oxygen,
  347. but it's considerably better than before.  If you launched a single-staged
  348. vehicle from LEO to the moon, and its rockets were as efficient as the space
  349. shuttle's (Isp = 4.464 km/sec in vacuum), it'd end up at about 74% fuel, the
  350. rest structural and payload.  You can do better by having disposable fuel
  351. tanks.  Let's see.  Assume 10% of the weight of a fuel tank is plumbing and
  352. tank (a bit high, i think).  I think that works out to 50 tons fuel + 5 tons
  353. tanks for the burn from LEO to lunar transfer, 20 tons fuel + 2 tons tanks
  354. for lunar transfer to lunar orbit, 20 tons for the lunar lander (engines,
  355. crew compartment, landing gear, structure, etc.)  So about 100 tons into
  356. orbit to land 20 tons on the moon.  At $8 million/ton, that's $800 million
  357. per lander, not counting materials and development.
  358.  
  359. For the trip back, assume 10 tons for the reentry capsule, 3 tons engines, 2
  360. tons misc, we need about 2.7 km/sec to launch from lunar surface to earth's
  361. atmosphere.  14 tons fuel + 1.4 tons tanks + 15 tons payload = 30.4 tons.
  362.  
  363. Typical launch configuration might be:  launch and land fuel tanker.  Launch
  364. and land cargo rocket.  Launch and land astronauts (selenonauts?).  Astronauts
  365. spend first day transfering fuel from fuel tanker to their launch vehicle,
  366. subsequent days exploring, setting up lunar base, etc.  Astronauts can be
  367. periodically resupplied from earth, each resupply ship containing enough
  368. fuel to top up the tanks in the return rocket.  So, maybe five ships all in
  369. all, for, umm, $4 billion in launch costs.  An order of magnitude cut in
  370. launch costs would help a great deal.
  371.  
  372.  
  373. david rickel
  374. decwrl!sci!daver
  375.  
  376. ------------------------------
  377.  
  378. End of SPACE Digest V9 #530
  379. *******************
  380.